(Project Information and Cost Estimation) is the latest web-based software used by the Kerala Public Works Department (PWD) Kerala Water Authority (KWA)
It is not a secret menu item. It is not a third-rate deal. Instead, Price 3 (often stylized as P3 or Price Level 3) is the financial bedrock upon which billions of rupees worth of public infrastructure—roads, bridges, government buildings, and drainage systems—are built, measured, and billed across the state. kerala pwd price 3
To understand Kerala’s crumbling roads or its gleaming new flyovers, one must first decode the ghost in the machine: The Schedule of Rates (SoR) – Price 3. (Project Information and Cost Estimation) is the latest
To avoid overpaying:
| Issue | Clarification | |-------|----------------| | Can a contractor claim higher than Price 3? | No – unless an item is not listed in SoR (then “rate analysis” is done by the Engineer-in-Charge). | | Does Price 3 include GST? | No – GST (currently 18% for most construction materials) is added separately as per applicable tax laws. | | Is Price 3 same across all districts? | No – varies due to local royalty, transport, and availability. | | What if material is sourced beyond standard lead? | Extra lead is compensated via “lead & lift” charges, but the base rate remains Price 3. | If this is for an active tender/estimate, confirm
The Kerala PWD Price 3 is available on the official website of the Public Works Department, Government of Kerala. The schedule of rates can be accessed by visiting the website and navigating to the relevant section. The rates are also available in print form and can be purchased from authorized vendors.